Current location:
OHS Documents Australia →
Store →
Safe Work Method Statements →
Plumbing
Plumbing
Formwork For A Concrete Pour
This 6 page SWMS details how to safely cut and set formwork made from formply so you can conduct a concrete pour. [ details … ]
|
$39.95 |
|
First published: 2013-01-07
Last updated: 2013-01-07 |
|
|
Operating Vacuum Truck For Non-Destructive Excavation
This 20 page SWMS details how to safely Operate a Vacuum Truck to conduct non-destructive excavation, including setup, excavation & potholing, drainage/sewer jetting, confined spaces work, emptying and cleaning the tank. [ details … ]
|
$99.95 |
|
First published: 2013-01-07
Last updated: 2013-01-07 |
|
|
Core Drilling and Cutting
This 7 page SWMS details how to safely core drill or cut into concrete, precast concrete, brick and other masonry. [ details … ]
|
$69.95 |
|
First published: 2010-04-06
Last updated: 2010-04-06 |
|
|
Dewatering Jobsite
This 9 page SWMS details how to safely remove, relocate, and treat water off a job site after rain or an unwanted water discharge. [ details … ]
|
$69.95 |
|
First published: 2010-04-07
Last updated: 2010-04-07 |
|
|
Excavation of Footings
This 10 page SWMS details how to safely Excavate Footings on site including excavation near services, truck movements, working around an excavated area, protecting and excavation and unanticipated finds such as contaminated materials or asbestos. [ details … ]
|
$69.95 |
|
First published: 2010-04-17
Last updated: 2010-04-17 |
|
|
Excavation Works
This 10 page SWMS details how to safely conduct excavation works on site including excavation near services, truck movements, working around an excavated area, protecting and excavation and unanticipated finds such as contaminated materials or asbestos. [ details … ]
|
$69.95 |
|
First published: 2010-04-09
Last updated: 2010-04-09 |
|
|
Formwork
This 7 page SWMS details how to safely erect formwork involving frame jacks, frames, bearers, decking and dismantling the formwork. [ details … ]
|
$69.95 |
|
First published: 2010-04-17
Last updated: 2010-04-17 |
|
|
General Labouring
This 6 page SWMS details how to safely conduct General Labouring, including sizing up a load, assessing travel path, positioning, preparing your lift, lifting, carrying, lowering, use of trolleys / wheel barrows, working in hot environments and more. [ details … ]
|
$69.95 |
|
First published: 2010-04-17
Last updated: 2010-04-17 |
|
|
Installation Of Barricades and Bunting
This 6 page SWMS details the Installation of Barricades & Bunting to secure hazards on site. [ details … ]
|
$69.95 |
|
First published: 2010-04-06
Last updated: 2010-04-06 |
|
|
Installation of Stormwater - Concrete Pipes
This 12 page SWMS details the safe installation of Concrete Stormwater Pipes onto a job site, including operating plant to dig trench, lifting and setting pipes into trench, sealing pipes, backfilling and compacting trench with a upright compactor. [ details … ]
|
$69.95 |
|
First published: 2010-04-17
Last updated: 2010-04-17 |
|
|
Installation of Stormwater - Concrete Pits
This 12 page SWMS details the safe installation of Concrete Stormwater Pits onto a job site, including operating plant, working in excavated area, formwork, placing / tying steel reinforcing bars, pouring / finishing concrete and stripping formwork. [ details … ]
|
$69.95 |
|
First published: 2010-04-17
Last updated: 2010-04-17 |
|
|
Installation of Stormwater - PVC Pipes
This 11 page SWMS details the safe installation of PVC Stormwater Pipes onto a job site, including operating plant to dig trench, working in excavated area, laying PVC Pipes, back filling trench and compacting trench with an upright compactor. [ details … ]
|
$69.95 |
|
First published: 2010-04-17
Last updated: 2010-04-17 |
|
|
Installation of Temporary Fencing
This 5 page SWMS details the safe installation of Temporary Fencing around a job site, including laying blocks/feet, installing and securing fence panels [ details … ]
|
$29.95 |
|
First published: 2010-04-17
Last updated: 2010-04-17 |
|
|
Installation of Temporary Fencing
This 5 page SWMS details the safe installation of Temporary Fencing around a job site, including laying blocks/feet, installing and securing fence panels [ details … ]
|
$29.95 |
|
First published: 2010-04-17
Last updated: 2010-04-17 |
|
|
Location of Underground Services By Potholing
This 10 page SWMS details how to safely Locate Underground Services by Potholing with an Excavator and Hand Tools, including plant inspection, work area inspection, use of shovel, back filling, and unanticipated contaminated materials (eg. Asbestos [ details … ]
|
$69.95 |
|
First published: 2010-04-15
Last updated: 2010-04-15 |
|
|
Operating a Articulated Dump Truck
This 9 page SWMS details how to safely Operate a Articulated Dump Truck, including plant inspection, work area inspection, unauthorised access into area and unanticipated contaminated materials (eg. Asbestos). [ details … ]
|
$69.95 |
|
First published: 2010-04-15
Last updated: 2010-04-15 |
|
|
Operating a Backhoe
This 10 page SWMS details how to safely Operate a Backhoe, including plant inspection, work area inspection, working around excavated area, unauthorised access into area and unanticipated contaminated materials (eg. Asbestos). [ details … ]
|
$69.95 |
|
First published: 2010-04-15
Last updated: 2010-04-15 |
|
|
Operating a Compactor
This 9 page SWMS details how to safely Operate a Compactor, including plant inspection, work area inspection, unauthorised access into area and unanticipated contaminated materials (eg. Asbestos). [ details … ]
|
$69.95 |
|
First published: 2010-04-15
Last updated: 2010-04-15 |
|
|
Operating a Elevated Work Platform
This 8 page SWMS details how to safely Operate a Elevated Work Platform including plant inspection, work area inspection, use of the plant, and Elevated Work Platform Rescue Procedure. [ details … ]
|
$69.95 |
|
First published: 2010-04-15
Last updated: 2010-04-15 |
|
|
Operating a Excavator
This 10 page SWMS details how to safely Operate a Excavator, including plant inspection, work area inspection, working around excavated area, unauthorised access into area and unanticipated contaminated materials (eg. Asbestos). [ details … ]
|
$69.95 |
|
First published: 2010-04-15
Last updated: 2010-04-15 |
|
|
Operating a Pad Foot Roller
This 9 page SWMS details how to safely Operate a Pad Foot Roller, including plant inspection, work area inspection, unauthorised access into area and unanticipated contaminated materials (eg. Asbestos). [ details … ]
|
$69.95 |
|
First published: 2010-04-15
Last updated: 2010-04-15 |
|
|
Operating a Skidsteer [Bobcat]
This 10 page SWMS details how to safely Operate a Skidsteer (Bobcat), including plant inspection, work area inspection, working around excavated area, unauthorised access into area and unanticipated contaminated materials (eg. Asbestos). [ details … ]
|
$69.95 |
|
First published: 2010-04-15
Last updated: 2010-04-15 |
|
|
Operating a Smooth Drum Roller
This 9 page SWMS details how to safely Operate a Smooth Drum Roller including plant inspection, work area inspection, use of the plant, unauthorised access into area and unanticipated contaminated materials (eg. Asbestos). [ details … ]
|
$69.95 |
|
First published: 2010-04-15
Last updated: 2010-04-15 |
|
|
Servicing and Maintenance of Plant
This 11 page SWMS details Servicing and Maintenance of Plant. [ details … ]
|
$99.95 |
|
First published: 2010-04-14
Last updated: 2010-04-14 |
|
|
Steel Fixing, Formwork, Pouring Concrete, Slabs, Driveways and Laybacks
This 8 page SWMS details how to safely set up, place sand, water poof membranes, edge boards, base discs, support chairs, steel mesh, tying steel mesh, pouring and finishing concrete. [ details … ]
|
$69.95 |
|
First published: 2010-04-14
Last updated: 2010-04-14 |
|
|
Steel Fixing
This 6 page SWMS details how to safely set up, cut reo-bars, place reo-bars or mesh and tie the reo-bars or mesh. [ details … ]
|
$69.95 |
|
First published: 2010-04-14
Last updated: 2010-04-14 |
|
|
Surveying
This 7 page SWMS details how to safely, drive your vehicle, set up traffic control, loading and unloading your vehicle, undertaking field surveying work and using aerosol paint. [ details … ]
|
$69.95 |
|
First published: 2010-04-14
Last updated: 2010-04-14 |
|
|
Tiling Floors and Walls
This 8 page SWMS details how to safely set up, water proof, lay tile bed, mix adhesive, lay tiles, cut tiles and grout. Also included is ladder and scaffold safety. [ details … ]
|
$69.95 |
|
First published: 2010-04-14
Last updated: 2010-04-14 |
|
|
Unloading and Loading Plant or Machinery onto Float
This 6 page SWMS details how to safely Load and Unload Plant or Machinery onto a Float or Truck. Including overhead hazards such as power lines, tie down and chain safety. [ details … ]
|
$69.95 |
|
First published: 2010-04-13
Last updated: 2010-04-13 |
|
|
Use of Aerosol Paint
This 5 page SWMS details how to safely use Aerosol Paint to make markings around the job site . [ details … ]
|
$29.95 |
|
First published: 2010-04-13
Last updated: 2010-04-13 |
|
|
Use of Air Compressor - Electric
This 5 page SWMS details how to safely set up, check and operate an electric Air Compressor including protection of the user and others in work area. [ details … ]
|
$69.95 |
|
First published: 2010-04-13
Last updated: 2010-04-13 |
|
|
Use of Air Compressor - Petrol Powered
This 6 page SWMS details how to safely set up, check, refuel and operate a petrol powered Air Compressor including protection of the user and others in work area. [ details … ]
|
$69.95 |
|
First published: 2010-04-13
Last updated: 2010-04-13 |
|
|
Use of Concrete Mixer - Electric
This 6 page SWMS details how to safely set up, check and operate an electric Concrete Mixer. It includes mixing concrete and electrical safety during clean up. [ details … ]
|
$69.95 |
|
First published: 2010-04-13
Last updated: 2010-04-13 |
|
|
Use of Concrete Mixer - Petrol Powered
This 6 page SWMS details how to safely set up, check, refuel and operate a petrol powered Concrete Mixer. It includes mixing concrete and clean up. [ details … ]
|
$69.95 |
|
First published: 2010-04-13
Last updated: 2010-04-13 |
|
|
Use of Cut Off Saw [Demolition Saw] - Electric
This 5 page SWMS details how to safely set up, check and operate an electric Cut Off Saw sometimes called a Demolition Saw. [ details … ]
|
$69.95 |
|
First published: 2010-04-13
Last updated: 2010-04-13 |
|
|
Use of Cut Off Saw [Demolition Saw] - Petrol Powered
This 7 page SWMS details how to safely set up, check, refuel and operate a petrol powered Cut Off Saw sometimes called a Demolition Saw. It includes protection of user and others in work area as well as a pictorial indication of how NOT to start the saw. [ details … ]
|
$69.95 |
|
First published: 2010-04-13
Last updated: 2010-04-13 |
|
|
Use of Electric Drill
This 5 page SWMS details how to safely set up, check and use an electric hand held Drill, including changing of drill bits. [ details … ]
|
$69.95 |
|
First published: 2010-04-12
Last updated: 2010-04-12 |
|
|
Use of Electric Grinder
This 6 page SWMS details how to safely set up, check and use an electric hand held Grinder, including changing of grinding discs. [ details … ]
|
$69.95 |
|
First published: 2010-04-12
Last updated: 2010-04-12 |
|
|
Use of a Electric Power Saw
This 7 page SWMS details how to safely set up, check and use an electric hand held Power Saw, including checks between cuts and changing of blades. [ details … ]
|
$69.95 |
|
First published: 2010-04-12
Last updated: 2010-04-12 |
|
|
Use of a Electric Reo Bar Bender
This 5 page SWMS details how to safely set up, check and use an Electric Reo Bar Bender. [ details … ]
|
$69.95 |
|
First published: 2010-04-12
Last updated: 2010-04-12 |
|
|
Use of Explosive Power Tools
This 8 page SWMS details how to safely unpack, set up, load, check and use an Explosive Power Tool, including misfire procedures, problems when nails dont go deep enough, cleaning, maintenance, storage of EPT and storage of EPT charges. [ details … ]
|
$99.95 |
|
First published: 2010-04-12
Last updated: 2010-04-12 |
|
|
Use of Extension Leads
This 5 page SWMS details how to safely set up, check and use Extension Leads including setting up lead stands and running out the leads. [ details … ]
|
$29.95 |
|
First published: 2010-04-12
Last updated: 2010-04-12 |
|
|
Use of Generators
This 6 page SWMS details how to safely set up, check, refuel and operate a petrol powered Generator. [ details … ]
|
$69.95 |
|
First published: 2010-04-12
Last updated: 2010-04-12 |
|
|
Use of Heat Gun
This 6 page SWMS details how to safely set up, check and use an electric Heat Gun. [ details … ]
|
$69.95 |
|
First published: 2010-04-12
Last updated: 2010-04-12 |
|
|
Use of Jackhammer - Compressed Air Powered
This 6 page SWMS details how to safely set up, check and use a compressed air powered Jackhammer, including refuelling, checking and set up of air compressor. [ details … ]
|
$69.95 |
|
First published: 2010-04-11
Last updated: 2010-04-11 |
|
|
Use of Jackhammer - Electric
This 5 page SWMS details how to safely set up, check and operate an electric Jackhammer. [ details … ]
|
$69.95 |
|
First published: 2010-04-11
Last updated: 2010-04-11 |
|
|
Use of Mobile Scaffold - Erection, Moving and Dismantling
This 7 page SWMS details how to safely erect, check, move, dismantle and use a Mobile Scaffold, including base frames, 2nd level frames, bracing kick panels, edge protection and access ladder. [ details … ]
|
$69.95 |
|
First published: 2010-04-11
Last updated: 2010-04-11 |
|
|
Use of a Oxy Acetylene Torch to Heat, Cut or Weld an Object
This 7 page SWMS details how to safely use a Oxy Acetylene Torch to heat, cut or weld an object. It also details bottle checks, valve checks, line checks as well as protecting other working in the area. [ details … ]
|
$69.95 |
|
First published: 2010-04-11
Last updated: 2010-04-11 |
|
|
Use of Plate Compactor to Compact Soil or Material
This 6 page SWMS details how to safely set up, check, refuel and operate a petrol powered plate compactor to compact soil or material. [ details … ]
|
$69.95 |
|
First published: 2010-04-11
Last updated: 2010-04-11 |
|
|
Use of Post Hole Digger [Hand Held Auger] - Electric
This 5 page SWMS details how to safely set up, check and operate an electric post hole digger or hand held auger. [ details … ]
|
$69.95 |
|
First published: 2010-04-11
Last updated: 2010-04-11 |
|
|
Use of Post Hole Digger [Hand Held Auger] - Petrol Powered
This 6 page SWMS details how to safely set up, check, refuel and operate a petrol powered post hole digger or hand held auger. [ details … ]
|
$69.95 |
|
First published: 2010-04-11
Last updated: 2010-04-11 |
|
|
Use of Power Hacksaw to Cut Metal
This 6 page SWMS details how to safely setup and use a power hacksaw to cut metal. It also details between cut checks on the equipment and changing blades. [ details … ]
|
$69.95 |
|
First published: 2010-04-11
Last updated: 2010-04-11 |
|
|
Use of Sandbag Filler or Sandbag Hopper
This 5 page SWMS details how to safely use a sandbag filler or otherwise known as a sandbag hopper, a device that you place sand into the top and a foot operated gate controls how much sad is dispensed into the sandbag. [ details … ]
|
$69.95 |
|
First published: 2010-04-11
Last updated: 2010-04-11 |
|
|
Use of Shovel
This 5 page SWMS details how to safely use a shovel controlling the main hazards that would cause an injury such as strains, back injury and manual handling injury. [ details … ]
|
$29.95 |
|
First published: 2010-04-11
Last updated: 2010-04-11 |
|
|
Use of Upright Compactor [Wakka Pakka, Kanga] to Compact Soil or Material
This 6 page SWMS details how to safely use an Upright Compactor (sometimes called Wakka Pakka, or Kanga) to compact soil or material. [ details … ]
|
$69.95 |
|
First published: 2010-04-11
Last updated: 2010-04-11 |
|
|
Working At Heights
This 5 page SWMS lists the steps involved in working at heights using a harness an existing safety line system. [ details … ]
|
$29.95 |
|
First published: 2010-04-11
Last updated: 2010-04-11 |
|
|
Working On Ladders
This 6 page SWMS details how to safely work on ladders on a construction site. [ details … ]
|
$69.95 |
|
First published: 2010-04-11
Last updated: 2010-04-11 |
|
|