Loading and Screening Of On Site Materials

Loading and Screening Of On Site Materials

This 9 page SWMS details how to safely Load and Screen On Site Materials to sort them into separate piles of different sized materials, including loading Screen with an excavator or loader, removing debris from Screen, loading and removing processed mater

This OHSDocs SWMS comprises of:

- Easy to use MS Word 2003 Format (.doc file a widely compatible format)

- Complete ready to use Safe Work Method Statement, (this is not a blank template)

- Suitable for Sub-Contractors, Principal Contractors and Employees

- Sections for Company and Site Specific details

- WorkCover HazPak Risk Matrix

- Pre-completed fields that are mandatory for a SWMS such as Duties & Responsibilities, Training, Legislation, Equipment and Maintenance

- Pre-completed Job Tasks, Risk Assessments and Controls

- A section where all employees being inducted into the SWMS can sign off to prove consultation

$69.95 (includes a 0.00% discount)

First published: 2010-04-15
Last updated: 2010-04-15