Installation of Silt Fencing by Hand [Sediment Controls]
This 5 page SWMS details the safe installation of Silt Fencing by Hand (Sediment Controls).
This OHSDocs SWMS comprises of:
- Easy to use MS Word 2003 Format (.doc file a widely compatible format)
- Complete ready to use Safe Work Method Statement, (this is not a blank template)
- Suitable for Sub-Contractors, Principal Contractors and Employees
- Sections for Company and Site Specific details
- WorkCover HazPak Risk Matrix
- Pre-completed fields that are mandatory for a SWMS such as Duties & Responsibilities, Training, Legislation, Equipment and Maintenance
- Pre-completed Job Tasks, Risk Assessments and Controls
- A section where all employees being inducted into the SWMS can sign off to prove consultation
$29.95 (includes a 0.00% discount)
First published: 2010-04-17
Last updated: 2010-04-17