Installation of Silt Fencing by Hand [Sediment Controls]

Installation of Silt Fencing by Hand [Sediment Controls]

This 5 page SWMS details the safe installation of Silt Fencing by Hand (Sediment Controls).

This OHSDocs SWMS comprises of:

- Easy to use MS Word 2003 Format (.doc file a widely compatible format)

- Complete ready to use Safe Work Method Statement, (this is not a blank template)

- Suitable for Sub-Contractors, Principal Contractors and Employees

- Sections for Company and Site Specific details

- WorkCover HazPak Risk Matrix

- Pre-completed fields that are mandatory for a SWMS such as Duties & Responsibilities, Training, Legislation, Equipment and Maintenance

- Pre-completed Job Tasks, Risk Assessments and Controls

- A section where all employees being inducted into the SWMS can sign off to prove consultation

$29.95 (includes a 0.00% discount)

First published: 2010-04-17
Last updated: 2010-04-17