Removal of Bonded Asbestos from Eaves and Fascia from a Building

Removal of Bonded Asbestos from Eaves and Fascia from a Building

This 13 page SWMS details how to safely remove Bonded Asbestos Sheeting from a Buildings Eaves and Fascia.

...Including elevated work platform rescue procedure, site establishment, traffic control, entering a controlled area, sealing area, preparing area, removal of eaves and fascia, sediment and erosion controls, workplace decontamination, waste removal, equipment decontamination and personal decontamination.

This OHSDocs SWMS comprises of:

- Easy to use MS Word 2003 Format (.doc file a widely compatible format)

- Complete ready to use Safe Work Method Statement, (this is not a blank template)

- Suitable for Sub-Contractors, Principal Contractors and Employees

- Sections for Company and Site Specific details

- WorkCover HazPak Risk Matrix

- Pre-completed fields that are mandatory for a SWMS such as Duties & Responsibilities, Training, Legislation,

Equipment and Maintenance

- Pre-completed Job Tasks, Risk Assessments and Controls

- A section where all employees being inducted into the SWMS can sign off to prove consultation

 

$99.95 (includes a 0.00% discount)

First published: 2010-04-15
Last updated: 2010-04-15