Stormwater Package
Bundle your Safe Work Method Statements and save. This Stormwater Installation Package should be every SWMS a Plumber would need to get a start on site.
- Each of the included SWMS in this package are the same available in the NSW section of this site.
- Save 40% with the benefits of buying your SWMS in a bundle.
Each OHSDocs SWMS in this bundle comprises of:
- Easy to use MS Word 2003 Format (.doc file a widely compatible format)
- Complete ready to use Safe Work Method Statement, (this is not a blank template)
- Suitable for Sub-Contractors, Principal Contractors and Employees
- Sections for Company and Site Specific details
- WorkCover HazPak Risk Matrix
- Pre-completed fields that are mandatory for a SWMS such as Duties & Responsibilities, Training, Legislation, Equipment and Maintenance
- Pre-completed Job Tasks, Risk Assessments and Controls
- A section where all employees being inducted into the SWMS can sign off to prove consultation
This package deal contains the following documents
- Installation Of Barricades and Bunting (normally $69.95) [ details … ]
- Excavation Works (normally $69.95) [ details … ]
- Use of Upright Compactor [Wakka Pakka, Kanga] to Compact Soil or Material (normally $69.95) [ details … ]
- Use of Shovel (normally $29.95) [ details … ]
- Use of Sandbag Filler or Sandbag Hopper (normally $69.95) [ details … ]
- Use of Plate Compactor to Compact Soil or Material (normally $69.95) [ details … ]
- Use of Jackhammer - Electric (normally $69.95) [ details … ]
- Use of Jackhammer - Compressed Air Powered (normally $69.95) [ details … ]
- Use of Explosive Power Tools (normally $99.95) [ details … ]
- Installation of Temporary Fencing (normally $29.95) [ details … ]
- Installation of Stormwater - PVC Pipes (normally $69.95) [ details … ]
- Installation of Stormwater - Concrete Pits (normally $69.95) [ details … ]
- Installation of Stormwater - Concrete Pipes (normally $69.95) [ details … ]
Only $515.61 (includes a 40.00% discount)