Roadworks Package

Bundle your Safe Work Method Statements and save. This Roadworks Package should be every SWMS a Roadworker would need to get a start on site.

- Each of the included SWMS in this package are the same available in the NSW section of this site.

- Save 40% with the benefits of buying your SWMS in a bundle.

Each OHSDocs SWMS in this bundle comprises of:

- Easy to use MS Word 2003 Format (.doc file a widely compatible format)

- Complete ready to use Safe Work Method Statement, (this is not a blank template)

- Suitable for Sub-Contractors, Principal Contractors and Employees

- Sections for Company and Site Specific details

- WorkCover HazPak Risk Matrix

- Pre-completed fields that are mandatory for a SWMS such as Duties & Responsibilities, Training, Legislation, Equipment and Maintenance

- Pre-completed Job Tasks, Risk Assessments and Controls

- A section where all employees being inducted into the SWMS can sign off to prove consultation

This package deal contains the following documents

  • Unloading and Loading Plant or Machinery onto Float (normally $69.95) details … ]
  • Traffic Control (normally $69.95) details … ]
  • Road and Pavement Construction Applying Spray Seal (normally $69.95) details … ]
  • Road and Pavement Construction Asphalt Placement (normally $69.95) details … ]
  • Painting - Linemarking (normally $29.95) details … ]
  • Operating a Three Point Roller (normally $69.95) details … ]
  • Operating a Street Sweeper (normally $69.95) details … ]
  • Operating a Smooth Drum Roller (normally $69.95) details … ]
  • Operating a Skidsteer [Bobcat] (normally $69.95) details … ]
  • Operating a Multi-Point Roller (normally $69.95) details … ]
  • Operating a Grader (normally $69.95) details … ]
  • Operating a Asphalt Paver (normally $69.95) details … ]
  • Laying of Kerb and Gutter (normally $69.95) details … ]

Only $521.61 (includes a 40.00% discount)